SR 20 (WBL) over SR 417 (I-575)

IN EAST CANTON · County 057, Georgia · Built 1976 · 2 Lanes · 12,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005700130
Year Built
1976
Length
107.6 m (353 ft)
Max Span
38.1 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
12,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,379,000
Total Project Cost
$2,069,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.