MARION SPENCE RD over SR 417 (I-575) SBL

2.5 MI NW OF BALL GROUND · County 057, Georgia · Built 1985 · 2 Lanes · 323 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005700890
Year Built
1985
Length
62.2 m (204.1 ft)
Max Span
33.2 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
323
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$797,000
Total Project Cost
$1,196,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.