I-575 (NBL) over CR774 MINERAL SPRINGS RD

1 MI NW OF BALL GROUND · County 057, Georgia · Built 1985 · 2 Lanes · 18,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000005700860
Year Built
1985
Length
43.6 m (143 ft)
Max Span
19.5 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
18,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$559,000
Total Project Cost
$838,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.