RMP I-575N TO SR20 over SR 20 (EBL) (A-588)

TOP OF TRI LEVEL · County 057, Georgia · Built 1982 · 1 Lanes · 5,020 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005700550
Year Built
1982
Length
76.5 m (251 ft)
Max Span
38.4 m
Width
11.3 m (37.1 ft)
Lanes
1
Daily Traffic
5,020
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$713,000
Total Project Cost
$1,070,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.