I-575 (SBL) over SR 140

IN SOUTH CANTON · County 057, Georgia · Built 1978 · 3 Lanes · 69,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005700470
Year Built
1978
Length
43.6 m (143 ft)
Max Span
22.3 m
Width
17 m (55.8 ft)
Lanes
3
Daily Traffic
69,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$711,000
Total Project Cost
$1,067,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.