TATE ROAD over CHATTOOGA RIVER

2 MI NW OF TRION · County 055, Georgia · Built 1980 · 2 Lanes · 610 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000005550320
Year Built
1980
Length
79.2 m (259.8 ft)
Max Span
12.2 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
610
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,016,000
Total Project Cost
$1,524,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.