CENTRAL AVENUE over CHATTOOGA RIVER

IN TRION · County 055, Georgia · Built 1926 · 2 Lanes · 5,230 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000005500360
Year Built
1926
Reconstructed
1961
Length
99.4 m (326.1 ft)
Max Span
13.4 m
Width
10.9 m (35.8 ft)
Lanes
2
Daily Traffic
5,230
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,274,000
Total Project Cost
$1,911,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.