TRION- TELOGA ROAD over TELOGA CREEK

5 MI NW OF SUMMERVILLE · County 055, Georgia · Built 1958 · 2 Lanes · 1,260 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000005500210
Year Built
1958
Length
45.1 m (148 ft)
Max Span
11.3 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
1,260
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$578,000
Total Project Cost
$867,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.