FAYE ROAD over MOON RIVER TRIB

3 MI SE OF VERNONBURG · County 051, Georgia · Built 2014 · 2 Lanes · 160 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000005150970
Year Built
2014
Length
39.6 m (129.9 ft)
Max Span
18.3 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
160
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$11,544,000
Total Project Cost
$17,316,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.