DIAMOND CAUSEWAY over MOON RIVER

5 MI SE OF MONT-CROSS RD · County 051, Georgia · Built 1970 · 2 Lanes · 19,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000005101460
Year Built
1970
Length
400.2 m (1313 ft)
Max Span
21.3 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
19,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,130,000
Total Project Cost
$7,695,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.