POOLER BY-PASS over CSX RAILROAD

1 MI S OF SR 26 IN POOLER · County 051, Georgia · Built 2003 · 2 Lanes · 17,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005150710
Year Built
2003
Length
143.6 m (471.1 ft)
Max Span
26.5 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
17,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,840,000
Total Project Cost
$2,760,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.