I-95 (SBL) over SR 26 (US 80)

10.5 MI NW OF SAVANNAH · County 051, Georgia · Built 1976 · 3 Lanes · 61,100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000005101140
Year Built
1976
Reconstructed
1995
Length
72.2 m (236.9 ft)
Max Span
22.9 m
Width
24.2 m (79.4 ft)
Lanes
3
Daily Traffic
61,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,179,000
Total Project Cost
$1,768,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.