TRUMAN PKY ON RMP over PROPOSED CONSTRUCTION

0.3 MI NE OF SAVANNAH · County 051, Georgia · Built 1997 · 2 Lanes · 50,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000005150490
Year Built
1997
Length
189 m (620.1 ft)
Max Span
18.3 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
50,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,422,000
Total Project Cost
$3,634,000