TALMADGE MEMORIAL over M4032- 2 SR 25C- 2 CR744

NW SECTION OF SAVANNAH · County 051, Georgia · Built 1991 · 4 Lanes · 22,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000005101690
Year Built
1991
Length
2698.1 m (8852 ft)
Max Span
335.3 m
Width
24.9 m (81.7 ft)
Lanes
4
Daily Traffic
22,600
Material
Concrete Continuous
Design
Stayed Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$53,452,000
Total Project Cost
$80,178,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.