I-95 (SBL) over BLACK CREEK

0.7 MI N OF JCT SR 21 · County 051, Georgia · Built 1976 · 3 Lanes · 62,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005101280
Year Built
1976
Reconstructed
1996
Length
41.5 m (136.2 ft)
Max Span
10.4 m
Width
24.3 m (79.7 ft)
Lanes
3
Daily Traffic
62,300
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$676,000
Total Project Cost
$1,014,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.