I-95 (NBL) over SR 21

INT I-95 & SR 21 · County 051, Georgia · Built 1976 · 3 Lanes · 79,700 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000005101250
Year Built
1976
Reconstructed
1995
Length
98.5 m (323.2 ft)
Max Span
33.2 m
Width
24.1 m (79.1 ft)
Lanes
3
Daily Traffic
79,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,606,000
Total Project Cost
$2,409,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.