I-75 (NBL) over THREE NOTCH ROAD

3.9 MI W OF RINGGOLD · County 047, Georgia · Built 1961 · 3 Lanes · 94,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000004700350
Year Built
1961
Reconstructed
1988
Length
47.9 m (157.2 ft)
Max Span
17.4 m
Width
19.3 m (63.3 ft)
Lanes
3
Daily Traffic
94,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$781,000
Total Project Cost
$1,171,000