I-75 over SR 2

2.7 MI W OF RINGGOLD · County 047, Georgia · Built 1961 · 6 Lanes · 94,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000004700330
Year Built
1961
Reconstructed
1988
Length
78 m (255.9 ft)
Max Span
21.9 m
Width
42.6 m (139.8 ft)
Lanes
6
Daily Traffic
94,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,091,000
Total Project Cost
$3,137,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.