I-20 EBL over SR 1 (US 27)

1 MILE SOUTH OF BREMEN · County 045, Georgia · Built 1976 · 2 Lanes · 43,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000004500570
Year Built
1976
Length
70.1 m (230 ft)
Max Span
35.1 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
43,700
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$899,000
Total Project Cost
$1,348,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.