BREMEN MT ZION ROA over I-20

1.5 MI SW OF BREMEN · County 045, Georgia · Built 1976 · 2 Lanes · 710 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000004500490
Year Built
1976
Length
100.6 m (330.1 ft)
Max Span
32 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
710
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,289,000
Total Project Cost
$1,934,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.