NEW POST ROAD over COUNTY LINE BRANCH
14 MI.N.W.OF WOODBINE · County 039, Georgia · Built 1955 · 2 Lanes · 194 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
31.146433, -81.806769
This bridge is in worse condition than 85.3% of bridges in County 039. The average bridge in Georgia is 0 years old; this one is 71 years old.
Nearby Bridges
SR 110 over CROSS SWAMP
Built 1957
FAS 1836 over COUNTY LINE BRANCH
Built 1978
US 82 COR Z WBL / over SATILLA RIVER OVERFLOW
Built 1964
US 82 COR Z EBL / over SATILLA RIVER OVERFLOW
Built 1988
BROWN TOWN ROAD over SATILLA RIVER TRIB.
Built 1976
US 82 COR Z EBL over SATILLA RIVER
Built 1988
US 82 COR Z WBL over SATILLA RIVER
Built 1964
US 82 COR Z EBL / over SATILLA RIVER OVERFLOW
Built 1988
POST ROAD over WHITE OAK SWAMP
Built 2002
US 17 OCEAN HWY over WAVERLY CREEK
Built 1955
Bridge Details
- Structure #
- 000000003950490
- Year Built
- 1955
- Length
- 9.8 m (32.2 ft)
- Max Span
- 4.9 m
- Width
- 6.5 m (21.3 ft)
- Lanes
- 2
- Daily Traffic
- 194
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $125,000
- Total Project Cost
- $188,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.