US 82 COR Z EBL / over SATILLA RIVER OVERFLOW

15 MI E OF HOBOKEN · County 025, Georgia · Built 1988 · 2 Lanes · 9,510 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002500360
Year Built
1988
Length
109.7 m (359.9 ft)
Max Span
12.2 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
9,510
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,407,000
Total Project Cost
$2,110,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.