I-75 over CABIN CREEK

8 MI SW OF JACKSON · County 035, Georgia · Built 1966 · 6 Lanes · 93,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000003500150
Year Built
1966
Reconstructed
1986
Length
45.7 m (149.9 ft)
Max Span
9.1 m
Width
40.9 m (134.2 ft)
Lanes
6
Daily Traffic
93,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,225,000
Total Project Cost
$1,838,000