SR 36 over I-75

8 MILES SW OF JACKSON · County 035, Georgia · Built 1999 · 6 Lanes · 10,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000003550440
Year Built
1999
Length
105.5 m (346.1 ft)
Max Span
36 m
Width
28.9 m (94.8 ft)
Lanes
6
Daily Traffic
10,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,827,000
Total Project Cost
$4,240,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.