US 80/ SR 87 over OCMULGEE RIVER

EAST MACON · County 021, Georgia · Built 2020 · 4 Lanes · 14,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000002150780
Year Built
2020
Length
128.6 m (421.9 ft)
Max Span
42.4 m
Width
57.3 m (188 ft)
Lanes
4
Daily Traffic
14,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$37,444,000
Total Project Cost
$56,166,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.