US 80 RAMP over RAMP TO I-16 EAST

EAST MACON · County 021, Georgia · Built 2024 · 2 Lanes · 4,350 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000002151140
Year Built
2024
Length
239.3 m (785.1 ft)
Max Span
45.7 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
4,350
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$69,708,000
Total Project Cost
$104,652,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.