LAKE POINT PARKWAY over CSX RAILROAD (340734N)

0.9 MILES EAST OF EMERSON · County 015, Georgia · Built 2019 · 2 Lanes · 8,194 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000001551520
Year Built
2019
Length
67.1 m (220.1 ft)
Max Span
42.4 m
Width
18.9 m (62 ft)
Lanes
2
Daily Traffic
8,194
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$19,536,000
Total Project Cost
$29,304,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.