RED TOP MOUNTAIN over US 41 / SR 3
3 MI SOUTH OF CARTERSVILL · County 015, Georgia · Built 2010 · 2 Lanes · 8,830 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
34.138881, -84.749986
This bridge is in worse condition than 61.6% of bridges in County 015. The average bridge in Georgia is 0 years old; this one is 16 years old.
Nearby Bridges
RED TOP MOUNTAIN R over SR 3 (US 41)
Built 2010
RED TOP MOUTAIN over SR 293 & CSX RAIL ROAD
Built 2010
RED TOP MOUTAIN over SR 293 AND CSX RAILROAD
Built 2010
RED TOP MTN. ROAD over I-75
Built 1977
SR 3 - US 41 (SBL) over SR 293- CSX RR (340429D)
Built 1951
SR 3 - US 41 (NBL) over SR 293- CSX RR (340429D)
Built 1951
LAKE POINT PARKWAY over CSX RAILROAD (340734N)
Built 2019
I-75 (SBL) over M-914
Built 1977
SR 293 over ETOWAH RIVER
Built 1928
I-75 (NBL) over ETOWAH RIVER
Built 1977
Bridge Details
- Structure #
- 000000001551350
- Year Built
- 2010
- Length
- 139.9 m (459 ft)
- Max Span
- 39.6 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 8,830
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,793,000
- Total Project Cost
- $2,690,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.