SR113/NBL over RACCOON CREEK

1.7 MI NE OF STILESBORO · County 015, Georgia · Built 2014 · 2 Lanes · 13,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000001551440
Year Built
2014
Length
61 m (200.1 ft)
Max Span
33.5 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
13,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$17,760,000
Total Project Cost
$26,640,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.