SR 113 over RICHLAND CREEK

2.8 MI NE OF STILESBORO · County 015, Georgia · Built 2014 · 4 Lanes · 9,350 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000001551430
Year Built
2014
Length
40.8 m (133.9 ft)
Max Span
40.8 m
Width
35.1 m (115.2 ft)
Lanes
4
Daily Traffic
9,350
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,914,000
Total Project Cost
$17,871,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.