I-75 (SBL) over SR 61 (US 411)

IN NE CARTERSVILLE · County 015, Georgia · Built 1970 · 4 Lanes · 60,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000001500940
Year Built
1970
Reconstructed
1987
Length
54.6 m (179.1 ft)
Max Span
27.1 m
Width
23.4 m (76.8 ft)
Lanes
4
Daily Traffic
60,100
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,081,000
Total Project Cost
$1,621,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.