I-75 (NBL) over SR 61 (US 411)

IN NE CARTERSVILLE · County 015, Georgia · Built 1970 · 4 Lanes · 80,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000001500930
Year Built
1970
Reconstructed
1977
Length
54.6 m (179.1 ft)
Max Span
27.1 m
Width
21.3 m (69.9 ft)
Lanes
4
Daily Traffic
80,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,081,000
Total Project Cost
$1,621,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.