I-85 (SR 403) over MULBERRY RIVER

8.6 MI NW OF WINDER · County 013, Georgia · Built 2019 · 6 Lanes · 64,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000001350600
Year Built
2019
Length
60.4 m (198.2 ft)
Max Span
49.4 m
Width
38.3 m (125.7 ft)
Lanes
6
Daily Traffic
64,100
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$17,612,000
Total Project Cost
$26,418,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.