SILK TREE POINT over MULBERRY RIVER

WEST SIDE OF BRASELTON · County 013, Georgia · Built 2005 · 2 Lanes · 1,594 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000001350590
Year Built
2005
Length
45.7 m (149.9 ft)
Max Span
18.3 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,594
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$13,320,000
Total Project Cost
$19,980,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.