SR 243 over OCONEE RIVER

4.7 MI SE OF MILLEDGEVILL · County 009, Georgia · Built 2015 · 2 Lanes · 4,140 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000950480
Year Built
2015
Length
457.2 m (1500 ft)
Max Span
42.7 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
4,140
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$133,200,000
Total Project Cost
$199,800,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.