US 441 BUS.SR 243 over CAMP CREEK

3.2 MI S OF MILLEDGEVILLE · County 009, Georgia · Built 1988 · 3 Lanes · 4,340 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000900450
Year Built
1988
Length
48.5 m (159.1 ft)
Max Span
16.2 m
Width
18.1 m (59.4 ft)
Lanes
3
Daily Traffic
4,340
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$791,000
Total Project Cost
$1,186,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.