RED OAK ROAD over SWEETWATER CREEK

3.5 MI S OF BAXLEY · County 001, Georgia · Built 2016 · 2 Lanes · 680 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000150550
Year Built
2016
Length
54.9 m (180.1 ft)
Max Span
6.1 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
680
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$15,984,000
Total Project Cost
$23,976,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.