MILES-BECKWORTH RD over SWEETWATER CREEK
2.3 MI S OF HOLMESVILLE · County 001, Georgia · Built 1980 · 2 Lanes · 70 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
31.672675, -82.319528
This bridge is in worse condition than 57.9% of bridges in County 001. The average bridge in Georgia is 0 years old; this one is 46 years old.
Nearby Bridges
RED OAK ROAD over SWEETWATER CREEK
Built 2016
BROWN ROAD over SWEETWATER CREEK
Built 2011
SR 15 over SWEETWATER CREEK TRIB
Built 1948
SATILLA ROAD over BIG SATILLA CREEK TRIB
Built 1974
POOR ROBIN ROAD over DRY BRANCH
Built 1976
FAS 1303 over BIG SATILLA CREEK
Built 2013
FAS 1303 over BIG SATILLA CREEK O/F
Built 2013
SATILLA ROAD over SWEETWATER CREEK
Built 1976
POOR ROBIN ROAD over SWEETWATER CREEK TRIB
Built 1976
US 1 SR 4 over BLACK WATER CREEK
Built 2011
Bridge Details
- Structure #
- 000000000150090
- Year Built
- 1980
- Length
- 30.5 m (100.1 ft)
- Max Span
- 6.1 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 70
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $391,000
- Total Project Cost
- $586,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.