SR 15 over BIG SATILLA CR

0.21 M. N. OF PIERCE CO. · County 001, Georgia · Built 2006 · 2 Lanes · 2,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000150390
Year Built
2006
Length
73.2 m (240.2 ft)
Max Span
12.2 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
2,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$938,000
Total Project Cost
$1,407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.