SERVICE ROAD over DRAINAGE CHANNEL (TIDAL)
0.25 Miles East of Marina · County 057, Florida · Built 1961 · 2 Lanes · 20 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
27.8235, -82.482139
This bridge is in worse condition than 74.8% of bridges in County 057. The average bridge in Florida is 0 years old; this one is 65 years old.
Nearby Bridges
MCCLELLAND AVENUE over NORTH-SOUTH CANAL
Built 1961
BAYSHORE BLVD. over CRAYFISH CANAL
Built 1982
SR-618B over GANDY BLVD
Built 2019
SR618 EB RAMP C over US-92 GANDY BLVD
Built 1975
SR618B Ramp D over Ramps to/from SR618/US92
Built 2021
SR618Bto/fromSR618 over US-92
Built 2021
SR618B EB to SR618 over Ramps to/from SR618/US92
Built 2021
SR618 EB RAMP C over US92/SR-600 DALE MBRYHWY
Built 1975
BIG BEND RD. over TECO DISCHARGE CANAL
Built 1975
SR-618 SELMON WB over US-92 SR-600 DALE MABRY
Built 1975
Bridge Details
- Structure #
- AFFLNVZR00001
- Year Built
- 1961
- Length
- 10.8 m (35.4 ft)
- Max Span
- 3.7 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 20
- Material
- Concrete
- Design
- Culvert
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $60,000
- Total Project Cost
- $90,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.