SR618Bto/fromSR618 over US-92

0.1 Mi W/O Dale Mabry · County 057, Florida · Built 2021 · 3 Lanes · 38,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
100853
Year Built
2021
Length
247.8 m (813 ft)
Max Span
72.2 m
Width
28.3 m (92.8 ft)
Lanes
3
Daily Traffic
38,500
Material
Steel
Design
Box Beam or Girders - Single or Spread
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.