NB I-95 (SR-9) over Ten Mile Creek

0.5 miles South of SR-70 · County 111, Florida · Built 1982 · 3 Lanes · 37,133 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
940123
Year Built
1982
Reconstructed
2019
Length
195.1 m (640.1 ft)
Max Span
23.6 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
37,133
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.