SR91 SB TPK 152.9 over SR 91 TPK(FT PIERCE INT)

SR 70 Okeechobee Exit 152 · County 111, Florida · Built 1956 · 2 Lanes · 2,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
940053
Year Built
1956
Reconstructed
2022
Length
53.4 m (175.2 ft)
Max Span
17.7 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
2,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.