ROYAL PLM BH BL NB over CANAL
2MI N OF OKEECHOBEE BLV · County 099, Florida · Built 1983 · 2 Lanes · 3,600 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
26.731372, -80.227928
This bridge is in worse condition than 12% of bridges in County 099. The average bridge in Florida is 0 years old; this one is 43 years old.
Nearby Bridges
ROYAL PLM BH BL SB over CANAL
Built 1983
CRESTWOOD BLVD. N over M-1 CANAL
Built 1988
MADRID STREET over RELIEF CANAL
Built 1976
LA MANCHA AVE. over RELIEF CANAL
Built 1975
ROYAL PLM BH BL SB over RELIEF CANAL
Built 1984
ROYAL PLM BH BL NB over RELIEF CANAL
Built 1972
LA MANCHA AVE. over RELIEF CANAL
Built 1976
PONCE DE LEON ST over RELIEF CANAL
Built 1972
OKEECHOBEE RD WB over M-1 CANAL
Built 1991
OKEECHOBEE BLVD EB over M-1 CANAL
Built 1977
Bridge Details
- Structure #
- 937361
- Year Built
- 1983
- Length
- 21.5 m (70.5 ft)
- Max Span
- 10.7 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,600
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.