ROYAL PLM BH BL SB over RELIEF CANAL
0.3M N OF OKEECHOBEE BLV · County 099, Florida · Built 1984 · 2 Lanes · 3,600 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
26.710511, -80.229039
This bridge is in worse condition than 4% of bridges in County 099. The average bridge in Florida is 0 years old; this one is 42 years old.
Nearby Bridges
ROYAL PLM BH BL NB over RELIEF CANAL
Built 1972
OKEECHOBEE RD WB over M-1 CANAL
Built 1991
OKEECHOBEE BLVD EB over M-1 CANAL
Built 1977
PONCE DE LEON ST over RELIEF CANAL
Built 1972
GOLDFINCH LANE over RELIEF CANAL
Built 1978
LA MANCHA AVE. over RELIEF CANAL
Built 1976
SPARROW DRIVE over CPB20 CANAL
Built 1978
CRESTWOOD BLVD. over ITCWD CANAL #1
Built 1999
ROYAL PALM BCH BLV over RELIEF CANAL
Built 1972
LA MANCHA AVE. over RELIEF CANAL
Built 1975
Bridge Details
- Structure #
- 937362
- Year Built
- 1984
- Length
- 21.3 m (69.9 ft)
- Max Span
- 10.7 m
- Width
- 11.3 m (37.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,600
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.