FLAVOR PICT ROAD over E-3 CANAL
0.5Mi WEST OF CR-809 · County 099, Florida · Built 1997 · 2 Lanes · 10,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
26.48785, -80.130819
This bridge is in worse condition than 12% of bridges in County 099. The average bridge in Florida is 0 years old; this one is 29 years old.
Nearby Bridges
El Clair Ranch Rd. over Canal L-30
Built 2020
MILITARY TRAIL SB over L-30 CANAL
Built 1990
MILITARY TRAIL NB over L-30 CANAL
Built 1990
PIPERS GLEN ROAD over LWDD E-3 CANAL
Built 1985
VIA DELRAY BLVD over LWDD E-3 CANAL
Built 1972
BARWICK RD over LWDD LAT 30 CANAL
Built 1964
JOG ROAD NB over LWDD L-30 CANAL
Built 1994
JOG ROAD SB over LWDD L-30 CANAL
Built 1999
LAKE IDA ROAD over E3 CANAL
Built 1996
Woolbright Road over LWDD E3 Canal
Built 2003
Bridge Details
- Structure #
- 934948
- Year Built
- 1997
- Length
- 22.9 m (75.1 ft)
- Max Span
- 10.7 m
- Width
- 17 m (55.8 ft)
- Lanes
- 2
- Daily Traffic
- 10,000
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.