El Clair Ranch Rd. over Canal L-30
1.2 Mi N of Lake Ida Rd. · County 099, Florida · Built 2020 · 2 Lanes · 5,800 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
26.483972, -80.138944
This bridge is in worse condition than 4% of bridges in County 099. The average bridge in Florida is 0 years old; this one is 6 years old.
Nearby Bridges
JOG ROAD NB over LWDD L-30 CANAL
Built 1994
JOG ROAD SB over LWDD L-30 CANAL
Built 1999
FLAVOR PICT ROAD over E-3 CANAL
Built 1997
VIA DELRAY BLVD over LWDD E-3 CANAL
Built 1972
MILITARY TRAIL SB over L-30 CANAL
Built 1990
MILITARY TRAIL NB over L-30 CANAL
Built 1990
LAKE IDA ROAD over E3 CANAL
Built 1996
PIPERS GLEN ROAD over LWDD E-3 CANAL
Built 1985
BARWICK RD over LWDD LAT 30 CANAL
Built 1964
Hagen Ranch Road over LWDD L30 Canal
Built 2002
Bridge Details
- Structure #
- 934426
- Year Built
- 2020
- Length
- 35.7 m (117.1 ft)
- Max Span
- 11.9 m
- Width
- 14.9 m (48.9 ft)
- Lanes
- 2
- Daily Traffic
- 5,800
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.