W. CAMINO REAL over LWDD E-3 CANAL
AT SR-809/W CAMINO REAL · County 099, Florida · Built 1972 · 6 Lanes · 12,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
26.344158, -80.129069
This bridge is in worse condition than 78.6% of bridges in County 099. The average bridge in Florida is 0 years old; this one is 54 years old.
Nearby Bridges
PALMETTO PK RD over LWDD E-3 CANAL
Built 1979
I-95 SB over W. Camino Real
Built 1972
I 95 NB over W Camino Real
Built 1972
I 95 SB over Palmetto Park Road
Built 1972
I 95 NB over Palmetto Park Road
Built 1972
SW 18th STREET EB over LWDD E-3 CANAL
Built 1975
SW 18TH STREET WB over LWDD E-3 CANAL
Built 1975
S. VERDE TRAIL over LWDD E-3 CANAL
Built 1987
SW 18th Street over I-95 (SR-9)
Built 1972
MILITARY TRAIL over HILLSBORO CANAL (G-08)
Built 1992
Bridge Details
- Structure #
- 934406
- Year Built
- 1972
- Reconstructed
- 1996
- Length
- 27.4 m (89.9 ft)
- Max Span
- 9.1 m
- Width
- 26.9 m (88.3 ft)
- Lanes
- 6
- Daily Traffic
- 12,400
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.