I 95 NB over W Camino Real

1.1 mi. N of Broward line · County 099, Florida · Built 1972 · 6 Lanes · 113,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
930198
Year Built
1972
Reconstructed
2020
Length
49 m (160.8 ft)
Max Span
27.9 m
Width
30.5 m (100.1 ft)
Lanes
6
Daily Traffic
113,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.