NB I-95 (SR-9) over C-51 Canal

0.6 mile South of SR-882 · County 099, Florida · Built 2008 · 6 Lanes · 112,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
930509
Year Built
2008
Length
83.2 m (273 ft)
Max Span
27.7 m
Width
31.4 m (103 ft)
Lanes
6
Daily Traffic
112,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.